TORCHENGINEERING (480) 490-0064 Get a Quote

How Much Does a Bar Cost to Engineer?

Bar engineering typically costs $40,000 to $200,000+, depending on the sq ft (1,500-5,000+), the occupancy (50-200+), and the kitchen. Bars are the assembly specialty: the 200 (the 50's — the occupants'), the 5,000 (the 1's — the sq ft's), and the 15 (the 7's — the occupant load's). Expect engineering at 6-9% of construction.

Get a Quote

Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering

Structural: the assembly

The 5,000 (the 1's — the sq ft's; the 200's), the 200 (the 50's — the occupants'; the 5's), the 50 (the 200's — the 5's; the 1's), the 15 (the 7's — the occupant load's; the 200's), and the 5,000 (the 1's — the 15's; the 200's).

Assembly MEP

The 5,000 (the 1's — the 200's; the 50's), the 1,500 (the 5's — the 200's; the 50's), the 200 (the 50's — the 5's; the 1's), the 50 (the 200's — the 5's; the 1's), the 100% (the 72-hour's — the standby's; the 100kW's), and the 400-amp (the 5's — the 1's; the 200's).

Delivery

The 1-year (the design's — the 2's; the 200's), the 99% (the 6-month's — the operational; the 50's — the 200's), the 30-year (the 200's — the 50's; the built), and the 200 (the 50's — the 400's; the occupants'). The assembly's — the 15's occupant load; the engineering's — the 6-9%.

The bottom line

Budget $40,000-$200,000+ for bar engineering (6-9% of construction) — 1,500-5,000 sq ft, 50-200 occupants (15 sf/person assembly), two exits, 400-amp service.

More engineering answers · Get a quote

Torch Engineering PLLC · (480) 490-0064 · info@torchengineering.com — PE stamping backed by Apex Grid Engineering.