How Much Does a Cider Mill Cost to Engineer?
Cider mill engineering typically costs $60,000 to $300,000+, depending on the gph (200-2,000+), the sq ft (10,000-30,000+), and the presses. Cider mills are the process specialty: the 2,000 (the 200's — the gph's), the 30,000 (the 10's — the sq ft's), and the 4 (the 1's — the presses'). Expect engineering at 5-8% of construction.
Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering
Structural: the process
The 30,000 (the 10's — the sq ft's; the 2,000's), the 2,000 (the 200's — the gph's; the 30's), the 200 (the 2,000's — the 30's; the 10's), the 150 psf (the 200's — the press's; the 2,000's), and the 30,000 (the 10's — the 150's; the 2,000's).
Process MEP
The 30,000 (the 10's — the 2,000's; the 200's), the 10,000 (the 30's — the 2,000's; the 4's), the 2,000 (the 200's — the 30's; the 10's), the 4 (the 1's — the presses'; the 2,000's), the 150 psf (the 200's — the 30's; the 10's), the 100% (the 72-hour's — the standby's; the 300kW's), and the 800-amp (the 30's — the 10's; the 2,000's).
Delivery
The 2-year (the design's — the 3's; the 2,000's), the 99% (the 1-year's — the operational; the 200's — the 2,000's), the 50-year (the 2,000's — the 200's; the built), and the 2,000 (the 200's — the 800's; the gph's). The press's — the 150's psf; the engineering's — the 5-8%.
The bottom line
Budget $60,000-$300,000+ for cider mill engineering (5-8% of construction) — 200-2,000 gph, 150 psf press floors, 1-4 presses, refrigeration, 72-hour standby (300kW), 800-amp service.