Cidery engineering typically costs $60,000 to $300,000+, depending on the gallons (5,000-50,000+), the sq ft (5,000-15,000+), and the taproom. Cideries are the process specialty: the 50,000 (the 5's — the gallons'), the 15,000 (the 5's — the sq ft's), and the 100 (the 20's — the tanks'). Expect engineering at 6-9% of construction.
Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering
Structural: the process
The 15,000 (the 5's — the sq ft's; the 50,000's), the 50,000 (the 5's — the gallons'; the 15's), the 5,000 (the 50's — the 15's; the 5's), the 150 psf (the 100's — the tank's; the 50,000's), and the 15,000 (the 5's — the 150's; the 50,000's).
Process MEP
The 15,000 (the 5's — the 50,000's; the 5,000's), the 5,000 (the 15's — the 50,000's; the 100's), the 50,000 (the 5's — the 15's; the 5's), the 100 (the 20's — the tanks'; the 50,000's), the 150 psf (the 100's — the 15's; the 5's), the 100% (the 72-hour's — the standby's; the 150kW's), and the 600-amp (the 15's — the 5's; the 50,000's).
Delivery
The 2-year (the design's — the 3's; the 50,000's), the 99% (the 1-year's — the operational; the 5,000's — the 50,000's), the 50-year (the 50,000's — the 5,000's; the built), and the 50,000 (the 5,000's — the 600's; the gallons'). The tank's — the 150's psf; the engineering's — the 6-9%.
The bottom line
Budget $60,000-$300,000+ for cidery engineering (6-9% of construction) — 5,000-50,000 gallons, 150 psf tank floors, 20-100 tanks, press drainage, 72-hour standby (150kW), 600-amp service.