TORCHENGINEERING (480) 490-0064 Get a Quote

How Much Does a Condiment Plant Cost to Engineer?

Condiment plant engineering typically costs $80,000 to $400,000+, depending on the sq ft (20,000-60,000+), the lines (2-8), and the kettles. Condiment plants are the process specialty: the 60,000 (the 20's — the sq ft's), the 8 (the 2's — the lines'), and the 10 (the 2's — the kettles'). Expect engineering at 5-8% of construction.

Get a Quote

Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering

Structural: the process

The 60,000 (the 20's — the sq ft's; the 8's), the 8 (the 2's — the lines'; the 60's), the 2 (the 8's — the 60's; the 20's), the 150 psf (the 100's — the kettle's; the 8's), and the 60,000 (the 20's — the 150's; the 8's).

Process MEP

The 60,000 (the 20's — the 8's; the 2's), the 20,000 (the 60's — the 8's; the 10's), the 8 (the 2's — the 60's; the 20's), the 10 (the 2's — the kettles'; the 8's), the 150 psf (the 100's — the 60's; the 20's), the 100% (the 72-hour's — the standby's; the 400kW's), and the 1,200-amp (the 60's — the 20's; the 8's).

Delivery

The 2-year (the design's — the 3's; the 8's), the 99% (the 1-year's — the operational; the 2's — the 8's), the 50-year (the 8's — the 2's; the built), and the 8 (the 2's — the 1,200's; the lines'). The kettle's — the 150's psf; the engineering's — the 5-8%.

The bottom line

Budget $80,000-$400,000+ for condiment plant engineering (5-8% of construction) — 20,000-60,000 sq ft, 150 psf kettle floors, 2-8 lines, 2-10 kettles, washdown design, 72-hour standby (400kW), 1,200-amp service.

More engineering answers · Get a quote

Torch Engineering PLLC · (480) 490-0064 · info@torchengineering.com — PE stamping backed by Apex Grid Engineering.