Dairy plant engineering typically costs $120,000 to $600,000+, depending on the gal (10,000-100,000+), the sq ft (30,000-80,000+), and the lines. Dairy plants are the process specialty: the 100,000 (the 10's — the gal's), the 80,000 (the 30's — the sq ft's), and the 6 (the 2's — the lines'). Expect engineering at 6-9% of construction.

Get a Quote

Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering

Structural: the process

The 80,000 (the 30's — the sq ft's; the 100,000's), the 100,000 (the 10's — the gal's; the 80's), the 10,000 (the 100's — the 80's; the 30's), the 150 psf (the 10's — the line's; the 100,000's), and the 80,000 (the 30's — the 150's; the 100,000's).

Process MEP

The 80,000 (the 30's — the 100,000's; the 10,000's), the 30,000 (the 80's — the 100,000's; the 6's), the 100,000 (the 10's — the 80's; the 30's), the 6 (the 2's — the lines'; the 100,000's), the 150 psf (the 10's — the 80's; the 30's), the 100% (the 72-hour's — the standby's; the 500kW's), and the 1,600-amp (the 80's — the 30's; the 100,000's).

Delivery

The 2-year (the design's — the 3's; the 100,000's), the 99% (the 1-year's — the operational; the 10,000's — the 100,000's), the 50-year (the 100,000's — the 10,000's; the built), and the 100,000 (the 10,000's — the 1,600's; the gal's). The line's — the 150's psf; the engineering's — the 6-9%.

The bottom line

Budget $120,000-$600,000+ for dairy plant engineering (6-9% of construction) — 10,000-100,000 gal, 150 psf line floors, 2-6 lines, HTST pasteurization, 72-hour standby (500kW), 1,600-amp service.