TORCHENGINEERING (480) 490-0064 Get a Quote

How Much Does a Distilled Spirits Plant Cost to Engineer?

Distilled spirits plant engineering typically costs $120,000 to $600,000+, depending on the proof gallons (5,000-50,000+), the sq ft (10,000-40,000+), and the stills. Distilled spirits plants are the process specialty: the 50,000 (the 5's — the proof gallons'), the 40,000 (the 10's — the sq ft's), and the 6 (the 1's — the stills'). Expect engineering at 6-9% of construction.

Get a Quote

Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering

Structural: the process

The 40,000 (the 10's — the sq ft's; the 50,000's), the 50,000 (the 5's — the proof gallons'; the 40's), the 5,000 (the 50's — the 40's; the 10's), the 150 psf (the 100's — the still's; the 50,000's), and the 40,000 (the 10's — the 150's; the 50,000's).

Process MEP

The 40,000 (the 10's — the 50,000's; the 5,000's), the 10,000 (the 40's — the 50,000's; the 6's), the 50,000 (the 5's — the 40's; the 10's), the 6 (the 1's — the stills'; the 50,000's), the 150 psf (the 100's — the 40's; the 10's), the 100% (the 72-hour's — the standby's; the 400kW's), and the 1,200-amp (the 40's — the 10's; the 50,000's).

Delivery

The 2-year (the design's — the 3's; the 50,000's), the 99% (the 1-year's — the operational; the 5,000's — the 50,000's), the 50-year (the 50,000's — the 5,000's; the built), and the 50,000 (the 5,000's — the 1,200's; the proof gallons'). The still's — the 150's psf; the engineering's — the 6-9%.

The bottom line

Budget $120,000-$600,000+ for distilled spirits plant engineering (6-9% of construction) — 5,000-50,000 proof gallons, 150 psf still floors, 1-6 stills, explosion-proof design, 72-hour standby (400kW), 1,200-amp service.

More engineering answers · Get a quote

Torch Engineering PLLC · (480) 490-0064 · info@torchengineering.com — PE stamping backed by Apex Grid Engineering.