How Much Does a Hard Seltzer Plant Cost to Engineer?
Hard seltzer plant engineering typically costs $100,000 to $500,000+, depending on the bpm (100-600+), the sq ft (30,000-80,000+), and the lines. Hard seltzer plants are the process specialty: the 600 (the 100's — the bpm's), the 80,000 (the 30's — the sq ft's), and the 6 (the 2's — the lines'). Expect engineering at 5-8% of construction.
Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering
Structural: the process
The 80,000 (the 30's — the sq ft's; the 600's), the 600 (the 100's — the bpm's; the 80's), the 100 (the 600's — the 80's; the 30's), the 150 psf (the 100's — the line's; the 600's), and the 80,000 (the 30's — the 150's; the 600's).
Process MEP
The 80,000 (the 30's — the 600's; the 100's), the 30,000 (the 80's — the 600's; the 6's), the 600 (the 100's — the 80's; the 30's), the 6 (the 2's — the lines'; the 600's), the 150 psf (the 100's — the 80's; the 30's), the 100% (the 72-hour's — the standby's; the 500kW's), and the 1,600-amp (the 80's — the 30's; the 600's).
Delivery
The 2-year (the design's — the 3's; the 600's), the 99% (the 1-year's — the operational; the 100's — the 600's), the 50-year (the 600's — the 100's; the built), and the 600 (the 100's — the 1,600's; the bpm's). The line's — the 150's psf; the engineering's — the 5-8%.
The bottom line
Budget $100,000-$500,000+ for hard seltzer plant engineering (5-8% of construction) — 100-600 bpm, 150 psf line floors, 2-6 lines, fermentation + carbonation, 72-hour standby (500kW), 1,600-amp service.