How Much Does a Meadery Cost to Engineer?
Meadery engineering typically costs $50,000 to $250,000+, depending on the gallons (2,000-20,000+), the sq ft (3,000-10,000+), and the tasting room. Meaderies are the process specialty: the 20,000 (the 2's — the gallons'), the 10,000 (the 3's — the sq ft's), and the 50 (the 10's — the tanks'). Expect engineering at 6-9% of construction.
Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering
Structural: the process
The 10,000 (the 3's — the sq ft's; the 20,000's), the 20,000 (the 2's — the gallons'; the 10's), the 2,000 (the 20's — the 10's; the 3's), the 150 psf (the 100's — the tank's; the 20,000's), and the 10,000 (the 3's — the 150's; the 20,000's).
Process MEP
The 10,000 (the 3's — the 20,000's; the 2,000's), the 3,000 (the 10's — the 20,000's; the 50's), the 20,000 (the 2's — the 10's; the 3's), the 50 (the 10's — the tanks'; the 20,000's), the 150 psf (the 100's — the 10's; the 3's), the 100% (the 72-hour's — the standby's; the 100kW's), and the 400-amp (the 10's — the 3's; the 20,000's).
Delivery
The 2-year (the design's — the 3's; the 20,000's), the 99% (the 1-year's — the operational; the 2,000's — the 20,000's), the 50-year (the 20,000's — the 2,000's; the built), and the 20,000 (the 2,000's — the 400's; the gallons'). The tank's — the 150's psf; the engineering's — the 6-9%.
The bottom line
Budget $50,000-$250,000+ for meadery engineering (6-9% of construction) — 2,000-20,000 gallons, 150 psf tank floors, 10-50 tanks, honey-handling drainage, 72-hour standby (100kW), 400-amp service.
Torch Engineering PLLC · (480) 490-0064 · info@torchengineering.com — PE stamping backed by Apex Grid Engineering.