TORCHENGINEERING (480) 490-0064 Get a Quote

How Much Does a Tea Packing Plant Cost to Engineer?

Tea packing plant engineering typically costs $60,000 to $300,000+, depending on the sq ft (10,000-40,000+), the lines (2-6), and the blending. Tea packing plants are the process specialty: the 40,000 (the 10's — the sq ft's), the 6 (the 2's — the lines'), and the 10 (the 2's — the blenders'). Expect engineering at 5-8% of construction.

Get a Quote

Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering

Structural: the process

The 40,000 (the 10's — the sq ft's; the 6's), the 6 (the 2's — the lines'; the 40's), the 2 (the 6's — the 40's; the 10's), the 125 psf (the 100's — the line's; the 6's), and the 40,000 (the 10's — the 125's; the 6's).

Process MEP

The 40,000 (the 10's — the 6's; the 2's), the 10,000 (the 40's — the 6's; the 10's), the 6 (the 2's — the 40's; the 10's), the 10 (the 2's — the blenders'; the 6's), the 125 psf (the 100's — the 40's; the 10's), the 100% (the 72-hour's — the standby's; the 300kW's), and the 800-amp (the 40's — the 10's; the 6's).

Delivery

The 2-year (the design's — the 3's; the 6's), the 99% (the 1-year's — the operational; the 2's — the 6's), the 50-year (the 6's — the 2's; the built), and the 6 (the 2's — the 800's; the lines'). The line's — the 125's psf; the engineering's — the 5-8%.

The bottom line

Budget $60,000-$300,000+ for tea packing plant engineering (5-8% of construction) — 10,000-40,000 sq ft, 125 psf line floors, 2-6 lines, 2-10 blenders, dust control, 72-hour standby (300kW), 800-amp service.

More engineering answers · Get a quote

Torch Engineering PLLC · (480) 490-0064 · info@torchengineering.com — PE stamping backed by Apex Grid Engineering.