How to Get a Building Permit in Arkansas?

Arkansas building permits are issued locally (the state has no statewide building code mandate — the jurisdictions adopt; the state enforces the fire code). Little Rock, Fort Smith, Fayetteville, Springdale, and Jonesboro have the programs. Arkansas's differentiators: the New Madrid seismic (the east's — the significant), the expansive soils (the clay's), and the tornado (the alley's — the edge).

Get a Quote

Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering

Where permits exist

Little Rock, Fort Smith, Fayetteville, Springdale, Jonesboro, Rogers, Conway: the departments (typically 2-6 weeks — the NWA's growth). Most counties/towns: no permits. Arkansas-licensed PE/architect stamps per the adopted code's thresholds.

New Madrid, soils, and tornado

The New Madrid (the east's — the M7-8; the SDC D's; the significant), the clay (the expansive — the central's; the foundations'), the tornado (the alley's — the edge; the shelter's), and the wind (the 115 mph — the plains').

Process notes

NWA's growth (the volumes — the patience), Little Rock's (the professional), the adoption (the city's — the verified), and the rural (the none's). The New Madrid's — the east's design driver.

The bottom line

Arkansas permits are local (2-6 weeks in cities; most rural areas have none). Design eastern Arkansas for New Madrid seismic (SDC D), expansive clays, and tornado shelters.