How to Prepare for a Special Inspection?

Prepare for special inspection by having the approved plans, the statement of special inspections, and the work ready and accessible — with the contractor's own quality control done first. The special inspector verifies code compliance; they are not the contractor's punch-list crew. Failed inspections cost re-inspection fees and schedule days, so preparation is pure economics.

Get a Quote

Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering

Before the inspector arrives

Confirm which inspections are required from the statement of special inspections (structural steel, welding, concrete placement, masonry, deep foundations, spray-applied fireproofing, and others per IBC Chapter 17). Schedule with the required notice — typically 24-48 hours. Have the approved plans on site, the work complete for the inspection phase (rebar tied and chaired before concrete, welds complete before UT), and access and lighting ready. The inspector cannot inspect work that is not ready.

During the inspection

Have the superintendent or foreman present — the inspector will have questions only the field team can answer. Do not cover work before inspection (concrete over uninspected rebar, drywall over uninspected framing). Keep material certifications and mill test reports on site; the inspector verifies heat numbers and grades against the specifications. Photograph everything the inspector photographs.

After: reports and corrections

The inspector issues reports to the owner, engineer of record, and building official — failed items become correction notices with re-inspection required. Fix deficiencies immediately and completely; partial fixes that fail re-inspection double the fees and the delay. At project end, the inspector's final report is a condition of the certificate of occupancy — track it like any other closeout deliverable.

The bottom line

Preparation = approved plans on site, work complete and accessible, contractor QC done first, and required notice given. Failed inspections cost fees and schedule — treat readiness as economics.