TORCHENGINEERING (480) 490-0064 Get a Quote

What Is Seismic Design for Parapets and Ornaments?

Parapets and ornaments (the ASCE 7 Chapter 13 — the components') are designed for (the Fp — the 0.3SDSIpWp; the anchorage — the out-of-plane) — the falling's (the hazard's — the historic; the unreinforced's). The design: the bracing (the through-bolted — the anchored), the retrofit (the URM's — the mandated; the ordinances'), and the inspection (the special's — the anchorage's). The earthquake's — the falling prevented.

Get a Quote

Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering

The hazard

The falling (the parapets' — the sidewalks'; the URM's — the killer), the ornaments (the cornices' — the detached; the historic's), the chimneys (the unreinforced's — the collapsed; the metal's — the braced), and the appendages (the signs' — the marquees'; the anchored).

Design per Chapter 13

The Fp (the 0.3SDSIpWp — the component's; the Ip's — the 1.0/1.5), the anchorage (the through-bolted — the parapet's; the 4x — the height's), the bracing (the steel's — the angles'; the designed), and the concrete (the ACI 318's — the Chapter 17's; the post-installed's).

Retrofit and ordinances

The URM (the ordinances' — the mandated; the LA's — the 1981's), the bracing (the parapet's — the retrofitted; the FEMA P-774's), the chimneys' (the rebuilt — the metal's; the braced), and the maintenance (the inspected — the deteriorated; the repointed). The parapet is the public's — the bracing is the law's.

The bottom line

Design parapets/ornaments per ASCE 7 Ch. 13 (Fp = 0.3SDSIpWp, through-bolted bracing) — retrofit URM parapets per FEMA P-774; comply with local mandatory bracing ordinances.

More engineering answers · Get a quote

Torch Engineering PLLC · (480) 490-0064 · info@torchengineering.com — PE stamping backed by Apex Grid Engineering.