TORCHENGINEERING (480) 490-0064 Get a Quote

Civil Engineering in Kettering, OH

Portsmouth is a historic Ohio River industrial city with chemical and manufacturing operations, requiring specialized facility maintenance and industrial infrastructure work.

Get a Quote

Best price · Quotes back fast · PE stamps backed by Apex Grid Engineering

What we design

  • Stormwater management design per Ohio NPDES permit requirements and Kettering stormwater authority standards.
  • Site development and grading plans for Kettering's active commercial and mixed-use project pipeline
  • Land development civil engineering for Kettering's commercial and institutional development — from conceptual site plan through permit-ready construction documents.
  • Access and utility coordination with Kettering public works, local utility providers, and the Ohio DOT — keeping commercial and institutional development moving through site access permits.
  • Paving, curb, and drainage infrastructure design for Kettering commercial, industrial, and institutional sites, sized for freeze-thaw cycles and lake-effect snow.
  • Regional stormwater management for Kettering — detention pond and retention basin design for high-intensity convective rainfall.

Project types

  • Commercial office & retail
  • Healthcare & medical facilities
  • Institutional & civic
  • Industrial & manufacturing facilities
  • Automotive & heavy manufacturing

Everything else your project needs

MEP Engineering in Kettering

Mechanical, electrical & plumbing design — permit-ready drawings, best price.

Structural Engineering in Kettering

Structural design, analysis & PE stamping — permit-ready drawings, best price.

PE Stamping in Kettering

Licensed PE stamps on your plans — fast turnaround, best price.

Pool Engineering in Kettering

Pool structural, systems & permits — engineered for plan check approval.

ADU Design in Kettering

Accessory dwelling unit plans — from concept to permit.

Engineering Cost Guide in Kettering

Straight answers on what engineering really costs.