Case Study
Atlanta Hyperscale Data Center Campus
Atlanta, GA · Data Center / Hyperscale · 2025
120,000 SF ·18 MW Critical IT Load

The Challenge
Delivering data center / hyperscale engineering on schedule and on budget in Atlanta, GA — no excuses, no delays.
Torch’s Role
Hyperscale data center in metro Atlanta — 18MW critical IT load, 2N electrical topology, and a campus civil site designed for a 40MW ultimate buildout.
Disciplines Delivered
MEP, structural, and civil coordination as the project demanded — one team, one point of accountability, permit-ready drawings.
Project Details
Atlanta, GA · 120,000 SF ·18 MW Critical IT Load · 2025
Representative project — request the full case study and we’ll walk you through the real numbers.
Torch Engineering PLLC · (480) 490-0064 · info@torchengineering.com — PE stamping backed by Apex Grid Engineering.