TORCHENGINEERING (480) 490-0064 Get a Quote

Case Study

Atlanta Hyperscale Data Center Campus

Atlanta, GA · Data Center / Hyperscale · 2025

120,000 SF ·18 MW Critical IT Load

Atlanta Hyperscale Data Center Campus

The Challenge

Delivering data center / hyperscale engineering on schedule and on budget in Atlanta, GA — no excuses, no delays.

Torch’s Role

Hyperscale data center in metro Atlanta — 18MW critical IT load, 2N electrical topology, and a campus civil site designed for a 40MW ultimate buildout.

Disciplines Delivered

MEP, structural, and civil coordination as the project demanded — one team, one point of accountability, permit-ready drawings.

Project Details

Atlanta, GA · 120,000 SF ·18 MW Critical IT Load · 2025

Representative project — request the full case study and we’ll walk you through the real numbers.

Want results like this?

Talk to a real engineer today. Quotes back fast.

Request Similar Engineering

or call (480) 490-0064

Torch Engineering PLLC · (480) 490-0064 · info@torchengineering.com — PE stamping backed by Apex Grid Engineering.